Executive Summary ISO PNode counts for the 7 US ISOs were relatively modest during the most recent Quarter, growing by 688, 628 Load, and 60 Generation. This brings the total PNodes in Clarity’s library to 77.121 nodes. Unlike previous quarters, there we no new...
Executive Summary ISO PNode counts for the 7 US ISOs grew by 1,532 during the second Quarter of 2023, 1,287 for Load and 245 for Generation, bringing Total PNode counts in Clarity’s database to 76,397. While last Quarter’s node growth was driven by EIM additions in...
Executive Summary ISO PNode counts for the 7 US ISOs grew by 1,311 during the first Quarter of 2023, 1,077 for Load and 234 for Generation, bringing Total PNode counts in Clarity’s database to over 75,000. Additions were largely driven by the introduction of...
Executive Summary There were broad additions to nodal totals for the 7 US ISOs during the 4th Quarter of 2022 to finish out the year. Once again ERCOT led the way in additions to Load Buses (386), while CAISO saw significant additions to both Generation and Storage...
Executive Summary SPP grew its nodal count during the Third Quarter 2022 almost exclusively through the addition of WAPA’s Western Area Colorado Missouri Balancing Area Utilities. The inclusion of nodal points owned by Basin Electric, Black Hills Electric, ...
Executive Summary Despite the addition of two large Utility EIM Members to CAISO (BPA and Tucson Electric), little meaningful new Generation or Load was added to the Seven ISO Grid System during the Second Quarter of 2022. In fact, with the exception of the...
Recent Comments